PONGKOR Mini Hydro Power Plant (4.30 MW)
PONGKOR
Mini Hydro Power Plant is located in Pongkor Village, Nanggung District, Bogor Regency, West Java
Province, utilizing the Cikaniki River. The location of this Mini
Hydro Power Plant is in the coordinates as follows:
Intake
Plan : 06°41'21,18"
SL / 106°41'21,18" EL
Headpond Plan : 06°39'58,31" SL / 106°33'46,39" EL
Powerhouse
plan : 06°39'49,97" SL /
106°33'48,05" EL
PONGKOR
Mini Hydro Power Plant can be reached with a distance of 95.5 km and travel
time of 2 hours 43 minutes from Jakarta by road trip. For more details, the way
to visit the location of the PONGKOR Mini Hydro Power Plant plan location can
be seen in the following map.
- Company Name : PT ANTAMLOKA HALIMUN ENERGI
-
Number of Units and Capacity : 2 x 2.150 kW
-
Installed Capacity : 4.30 MW
-
Location of Plant : Pongkor Village, Nanggung Subdistrict, Bogor District, West Java
-
Commercial Operation Date : 2021 (planned)
-
Debit Plan : 4.50 m3/s
-
Effective Fall Height : 131.90 m
-
Water Source : Cikaniki River
-
Power Type : Run off River
-
Capacity Factor (CF) : 60% - 70%
-
Turbine Type : Francis Horizontal
-
Governor : Electro Hydraulic Type
-
Generator : Horizontal Synchronous Type
-
Engineering Consultant (Feasibility Study) : PT WIRATMAN
-
Engineering Consultant (Detailed Engineering Design) : PT WIRATMAN