GEUMPANG Hydro Power Plant (19.00 MW)

GEUMPANG Hydro Power Plant is located in Geumpang Pekan and Meloak Sepakat Villages, Putri Betung Subdistrict, Gayo Lues District, Nanggroe Aceh Darussalam Province, utilizing the Gumpang River flow. The location of this Mini Hydro Power Plant is in the coordinates as follows:

Weir Plan    : 03°48'16.30" NL / 97°33'05.50" EL

Headpond Plan  : 03°47'43.50" NL / 97°33'54.40" EL

Powerhouse Plan  : 03°47'31.40" NL / 97°35'55.80" EL

GEUMPANG hydropower plant location can be reached with a distance of 40.5 km and takes 1 hour 6 minutes from Patiambang Airport, Blangkejeren by road trip. For more details, the location of GEUMPANG hydropower plant plan can be seen in the maps.


  • Company Name : PT TARUNA OMEGA PERKASA
  • Number of Units and Capacity : 2 x 9.500 Kw
  • Installed Capacity : 19 MW
  • Location of Plant : Geumpang Pekan and Meloak Sepakat Village, Putri Betung Subdistrict, Gayo Lues District, Nanggroe Aceh Darussalam
  • Commercial Operation Date : 2022 (Planned)
  • Debit Plan : 21.88 m3/s
  • Effective Fall Height : 104.36 m
  • Water Source : Geumpang River
  • Power Type : Run off River
  • Capacity Factor (CF) : 60% - 70%
  • Turbine Type : Francis Horizontal
  • Governor : Electro Hydraulic Type
  • Generator : Horizontal Synchronous Type
  • Engineering Consultant (Feasibility Study) : PT ESCO MURTI PRADANA